Skip to content

FAQ

Before you call.

01Do you need engineering drawings before quoting?

Yes. We need engineering drawings before we can quote accurately. Architectural drawings help too, especially for exposed steel, but the engineering sets the members and connections we price.

02How long does a typical job take?

An indicative timeframe is 4–6 weeks, depending on scope, drawing approvals and workshop load. We will confirm a realistic programme with your quote.

03Is there a minimum job size?

We usually work on projects from around one tonne of steel. If you are unsure of your tonnage, send the drawings and we will tell you.

04Where do you work?

Commercial and industrial projects anywhere. High-end residential across Sydney’s city, eastern suburbs and south. We do not currently take residential work in western Sydney.

05Do you install, or just fabricate?

Both. Detailing, fabrication and installation are done by one team, so there is a single point of accountability from drawings to site.

06Who do you work with?

Mostly architects, builders and head contractors. Homeowners are welcome to contact us, but we will usually coordinate through the builder and the engineer.

07Can I upload drawings through the form?

Not through this form. Send your enquiry and we will reply with how to share drawings. Existing clients can use the Certified Steel portal.

08How is this related to Certified Steel?

Architectural Steel Fabrication Sydney is Certified Steel’s specialist service for architects and builders. Same workshop, same team, a focus on architectural and exposed steel.

Existing client? Use the Certified Steel portal.

Got engineering drawings? We can price it.