Skip to content

Certified Steel · Architectural division

Steel, drawn
to the millimetre.Architectural steel fabrication Sydney

Detailing, fabrication and installation for architects and builders in Sydney — by one accountable team, so the connection on the drawing is the connection on site.

Fig. 01 — Beam to column, bolted end plate · move to inspect

§ 1 — Accountability

Most steel problems are handover problems — detailer to workshop, workshop to installer. We removed the handovers. The team that draws it, builds it and bolts it in.

Fig. 02 — Anatomy

Scroll to take it apart.

  1. 01ColumnStiffened at flange lines to take the moment.
  2. 02End plateShop-welded to the beam; thickness set by engineering.
  3. 03Bolt groupGauge and pitch fixed in detailing, drilled once.
  4. 04BeamCut to length against the site setout.

§ 2 — Scope

What we take on

All services →

§ 3 — From the workshop’s recent work

Finished, in place.

View all photos →
Overhead view of a circular steel frame with radial members meeting at a central hub, painted blue, on a roof deck
Radial frame — members converging on a central ring
Black perforated steel screen enclosure on a metal standing-seam roof beneath timber cladding
Perforated screen enclosure on a standing-seam roof
Front-on view of black perforated screen panels on a rooftop
Front elevation of the installed screen
Corner of a black perforated steel screen on a roof, safety cones nearby
Corner return — where the detailing shows
Looking down a run of perforated black steel screen panels with slim vertical framing
Slim vertical framing between perforated infills
Perforated steel screen panels viewed down the length of a narrow roof walkway
Panel run along a narrow roof edge

§ 4 — Sequence

Five steps. No handovers.

  1. 01Drawings inSend engineering drawings (and architectural, if exposed). We review scope, tonnage and anything unresolved.
  2. 02QuoteA priced scope based on the engineering, with assumptions and questions listed — not buried.
  3. 03Shop detailingConnections, setout and finishes resolved into shop drawings for your review and approval.
  4. 04FabricationCut, drilled, welded and finished in the workshop by the team that detailed it.
  5. 05InstallationOur crew installs, coordinated with the builder’s programme. One team, start to finish.
How each step works →

§ 5 — Fit check

Is your project a fit?

Straight answers before you spend time on an enquiry.

Commercial / industrial
Anywhere
High-end residential
Sydney city, east & south
Usual minimum
≈ 1 tonne
To quote
Engineering drawings
Indicative timeframe
4–6 weeks

§ 6 — Questions

Asked often.

All FAQs →
Do you need engineering drawings before quoting?

Yes. We need engineering drawings before we can quote accurately. Architectural drawings help too, especially for exposed steel, but the engineering sets the members and connections we price.

How long does a typical job take?

An indicative timeframe is 4–6 weeks, depending on scope, drawing approvals and workshop load. We will confirm a realistic programme with your quote.

Is there a minimum job size?

We usually work on projects from around one tonne of steel. If you are unsure of your tonnage, send the drawings and we will tell you.

Where do you work?

Commercial and industrial projects anywhere. High-end residential across Sydney’s city, eastern suburbs and south. We do not currently take residential work in western Sydney.

Got engineering drawings? We can price it.